Cold Joint is a small practice that builds in one material. It is slow, heavy and impossible to change once it has set, so we draw everything first and then we draw it again.
Founded
2009
Buildings
31
Paint used
0 L
Concrete
6,240 m³
Keep scrolling
Spout Tower · five pours
01
Draw
Every board, tie hole and seam is drawn before anyone orders timber. The drawing is the building, and the site just catches up.
02
Pour
We stand on site for every pour. Concrete cannot be corrected, only planned for, and that is the part of this job we like best.
03
Strike
The formwork comes off and the building tells you whether you were right. Most of the time, we were. We keep notes on the rest.
Coffered ceiling, Hollow House
Stair void, Spout Tower
Cast basin, Drum House
Site visits
By appointment only
Wear boots